Skip to main content

Onsite Stormwater Disposal
Testing & Reporting

Onsite Stormwater Disposal – Testing & Reporting

Saturated Hydraulic Conductivity Testing

A saturated hydraulic conductivity report for stormwater is an essential component in stormwater management and drainage design, as it determines the soil’s ability to absorb and transmit water during heavy rainfall or flooding conditions.

In the context of stormwater, hydraulic conductivity measures how easily water flows through soil once the soil is fully saturated. This value is essential for engineers designing drainage systems, retention basins, and other stormwater infrastructure.

If the soil has a high saturated hydraulic conductivity, water will percolate through the ground more quickly, reducing surface runoff and the potential for flooding. On the other hand, soils with low conductivity, such as clay, may lead to poor drainage, causing water to pool or require additional infrastructure to manage.

The results in this detailed report are used to guide the design of stormwater systems, ensuring that the infrastructure can handle water efficiently, prevent erosion, and reduce the risk of waterlogging or overflow during storms.

We also deliver a full suite of other Geotechnical services and testing.

Why Choose Smolders Geotechnical?

  • All work is carried out by qualified engineering geologists or geotechnical engineers.
  • Fully insured with Professional Indemnity and Public Liability coverage.
  • Extensive experience with residential and commercial developments.
  • We offer a wide range of drilling rigs and equipment to suit any site conditions.
  • Members of the Foundations and Footing Society Victoria, Australian Geomechanics Society, and the Australian Institute of Geoscientists.
  • Fast, responsive, and comprehensive service.
  • Expertise with challenging and tight-access sites.
  • Your first step to achieving the best outcome for your build.

Smolders Geotechnical Services

Our Services Include:

  • Soil Testing/Site Classification Reports to AS2870:2011
  • Geotechnical Assessments and Landslip Risk Assessments for EMO
  • Full Geotechnical Site Assessments
  • Basement Investigations
  • Saturated Hydraulic Conductivity Testing
  • Land Capability Assessments (LCA)
  • Footing Probes
  • Bushfire Attack Levels, Wind Load Ratings
Soil Testing
Link to Soil Testing
Land Capability Assessment
Link to Land Capability Assessment
Geotechnical Assessments
Link to Geotechnical Assessments
Geotechnical Site Assessments
Link to Geotechnical Site Assessments
Basement Investigations
Link to Basement Investigations
Onsite Storm Water Disposal
Link to Onsite Storm Water Disposal
Inground Pool Testing
Link to Inground Pool Testing
Landslip Risk Assessments
Link to Landslip Risk Assessments

All works completed by
qualified professional
Engineering Geologists.

Contact UsGet an Obligation Free Quote